Reconstruction of Mudeirej Bridge
Employer
US Government
Role of BUTEC
Awarded
Completed
Scope of Work
Replacement of the main structural elements (decks and beams) and installation of the supporting bearings for both the north and the south bridges on an EPC basis
Project Description
• 40 m span precast U-section including wings, each element weighing 210 tons
• Pre-cast slab permanent formwork application
• Deck slab normal cast
• Post tensioning of pre-cast girders, transportation and maneuver by means of straddle carriers, each having a lifting capacity of 110 tons and a launching truss for application
• External post-tensioning of diaphragm after cast