Pearl GTL Temporary Power Supply
Employer
Qatar Shell GTL Limited
Role of BUTEC
Awarded
Completed
Scope of Work
EPC of the following:
- Civil works for 4 substations, 33/11 kV, 40 MVA each
- 120 km of underground 11 kV cables for ring main units
- 110 km of underground 33 kV cables and connection to power grid
- 20 km of underground fiber optic cables
- Earthing grid for substations
- Installation of the following:
- 130 ring main units, 1 MVA each
- 11 kV and 33 kV switchgears
- Power transformers and oil refilling
- Assistance to SIEMENS in testing and commissioning
Project Description
Power supply for the construction site of the gas to liquid plant; covering an area of 4 km2 and power supply for a construction camp accommodating up to 25,000 persons on a plot of 1.7 km2.