Lattakia Spinning Mill Complex Project I – II
Employer
Ministry of Industry In Syria
Role of BUTEC
Awarded
Completed
Scope of Work
EPC of civil works, industrial plant utilities and related networks, as well as erection of all process equipment.
Project Description
- Mill annual capacity: 27,000 tons of combed & carded cotton
- Total site area: 420,000 m2
- Total built area: 147,000 m2, including 115,000 m2 of metallic pre-engineered buildings
- Roads and parking areas: 68,000 m2
- 20 km of reinforced concrete channels (200 cm wide × 300 cm high) for underground return air
- 20 kV/400 V electrical sub-station with 18 2500 kVA transformers, ring main units, including incoming / outgoing MV cubicles and metering / protection MV cubicles
- 19 built-up air handling plants with air filters, air washers and heat exchangers; cooling capacity 1,760 kW each
- Industrial heating plant: 2,000 kW
- Water collection and storage utility, with river water intake structure: 4×6” pumps, capacity 120 m3/h each, 6 deep wells, capacity 100 m3/h each, and a water storage reservoir of 3,500 m3
- Water treatment and softening plants (filtration, decantation, flocculation): capacity 36 m3/h
- Air plants, 4×16 m3/min for process and 4×8 m3/min for cleaning network, with all ancillaries including filters, dryers, receivers and distribution networks
- Fire fighting system, with fire pumping station (216 m3/hr), fire hydrants network for site protection, hose reels for production areas and sprinkler system in all stores (includes fire brigade equipment)
- Underground drainage network: 15 km
- Surface concrete channels for rain water drainage: 20 km
- Sewage treatment plant 100 m3/d, with primary and secondary treatment