Jbeil Wastewater Treatment Plant
Employer
Ministry of Energy and Water
Role of BUTEC
Awarded
Completed
Scope of Work
EPC for civil works and electromechanical installation as well as erection of all equipment. The biofiltration used in the process system ensures an increase up to 50% to the overall capacity of the plant.
Project Description
- Population equivalent: 45,000 PE
- Total daily design flow: 8,179 m3/d
- Design peak flow: 903 m3/h
- Sea outfall DN: 500 mm, length: 910 m
- 20 buildings and structures, landscaping, irrigation, process and service networks
- 2 generator sets of 860 kVA and 260 kVA, 2 transformers and MV switch gears. UPS, normal lighting fixtures, CCTV, data, telephone network, SCADA, and intrusion alarm systems
- HVAC, water supply, drainage, irrigation and sewer, and industrial water network