Gas Turbine Units
Employer
SONELGAZ
Role of BUTEC
Awarded
Completed
Scope of Work
- Installation and erection of the GT units including power trailer, control trailer, gas skids and small accessory components
- Supply, prefabrication and installation of gas piping including all necessary supports, NDT test, painting and insulation
- Supply, prefabrication and installation of steel structure including all necessary supports, painting and insulation
- Installation and connection of the mobile MV substations
- Installation of the instrumentation system
- Supply, installation and connection of power cable between the GT units and the substations with all necessary cable trays and accessories
- Supply, installation and connection of control cable between the GT units, auxiliaries’ equipment and substations with all necessary cable trays and accessories
- Pre-commissioning and commissioning of the plant
Project Description
Installation and commissioning of 11 Mobile Pac® GT units of 25 MW each, including the power trailer, gas skids, small accessory components, cabling and pipe fitting. The project is divided into two lots: 9 units at M’sila site and 2 units at Boufarik site.