Djelfa, Mecheria, Mostaganem Wastewater Treatment Plants
Employer
Ministry of Hydraulic Resources
National Office for Sanitation (ONA)
Role of BUTEC
Awarded
Completed
Scope of Work
EPC for civil works, as well as installation of the various process & utility networks, and erection of all equipment for Djelfa, and Mecheria wastewater treatment plants. In Mostaganem it covered architectural, civil, & electromechanical works for process and non-process as well as testing and commissioning of the plant, in addition to management and operation for a period of two years starting with the date of the preliminary acceptance.
Projects In Figures
Djelfa | Mecheria | Mostaganem | |
---|---|---|---|
Popuation Equivalent | 270,000 PE | 92,000 PE | 350,000 PE |
Total Daily Design Flow | 36,300 m3/d | 12,880 m3/d | 56,000 m3/d |
Design Peak Flow | 2,360 m3/h | 915 m3/h | 3,735 m3/h |
Hydraulic Concrete Structures | 11 | 20 | 17 |