Bellara Steel Complex Balance of Plant

Employer

Algerian Qatari Steel

Role of BUTEC

Idom, Spain

Awarded

Main contractor in JV with Elecnor

Completed

April 2015

 

Scope of Work

Construction of all utilities buildings, foundation works for technological packages, piping and cabling interconnection between technological packages, roads, and infrastructure surrounding the different process facilities of the steel factory

Project Description

  • Foundation works for the technological packages in the BELLARA project such as piling works (872 piles) and concrete foundations (45,000 m3)
  • Construction of concrete utility buildings (offices, locker rooms, etc.) (Built-up area of 7,500 m2)
  • Construction of steel structure buildings (warehouses, workshops, etc.) (3,500 tons or built-up area of 82,000 m2)
  • Construction of pipe rack between the technological packages (1,500 tons)
  • Supply and installation of the pipe network between the technological packages (10,000 m)
  •  Supply and installation of electrical and instrumentation network between the technological packages

    (150,000 m2)

  • External works such as road works, fence and main entrance area. (85,000 m2 of roads and 1,000 m of fence)
  • Supply and installation of railways inside the boundary of the project (7,000 m)
  •  Construction of a slag area and water basins for the project (74,000 m2)