Barwa Wastewater Treatment Plant

Employer

Barwa City – Marafeq Qatar

Role of BUTEC

Main contractor in Consortium with Degrémont, subsidiary of “Groupe Suez”, France

Awarded

April 2010

Completed

December 2012

Scope of Work

EPC for civil works, electro-mechanical installation as well as erection of all equipment.

Project Description

  • Population equivalent: 50,000 PE
  • Total daily design flow: 13,500 m3/d
  • Design peak flow: 1,400 m3/h
  • EPC of 18 process structures (pretreatment cyclor cells, filtration, dewatering building, etc.)
  • Construction of ancillary buildings (administration, workshops, laboratory, pump house,etc.)
  • Landscaping and related networks
  • Installation of process utility networks (sludge, industrial water, rain water drainage, etc.)