Gas Turbine Units

Employer

SONELGAZ

Role of BUTEC

Subcontractor for civil And MEP works Main contractor: PW Power Systems

Awarded

February 2014

Completed

August 2015

Scope of Work

  • Installation and erection of the GT units including power trailer, control trailer, gas skids and small accessory components
  • Supply, prefabrication and installation of gas piping including all necessary supports, NDT test, painting and insulation
  • Supply, prefabrication and installation of steel structure including all necessary supports, painting and insulation
  • Installation and connection of the mobile MV substations
  • Installation of the instrumentation system
  • Supply, installation and connection of power cable between the GT units and the substations with all necessary cable trays and accessories
  • Supply, installation and connection of control cable between the GT units, auxiliaries’ equipment and substations with all necessary cable trays and accessories
  • Pre-commissioning and commissioning of the plant

Project Description

Installation and commissioning of 11 Mobile Pac® GT units of 25 MW each, including the power trailer, gas skids, small accessory components, cabling and pipe fitting. The project is divided into two lots: 9 units at M’sila site and 2 units at Boufarik site.